COST METHODOLOGY · TABLE VERSION B-2026-07-17

How Knotworth builds its cost ranges

In short: Every figure in a Knotworth report is a low–high band with a stated assumption, produced by deterministic rules over a versioned reference table - no AI in the arithmetic. This page publishes that table, the scaling and regional method, the replacement intervals, and the limits you should know about.

Where the ranges come from

Every band below lists the references it was built from, each labelled by what kind of evidence it is - a published price list, an owner's reported cost, or our own modelled estimate - with the date it was checked, the geography it was observed in and the exact scope that was priced. A buyer's own pasted quote is a fourth kind and outranks all three. Bands are planning figures for a typical production cruiser in sail-away condition, not quotes: rows marked local quote advised should be replaced by a current figure from your yard before they anchor a decision. Ranges are stored in USD and converted to your currency at the daily ECB rate, stamped into each report along with this table's version.

Size scaling

Bands are anchored at 30 / 40 / 47.5 ft and interpolated linearly between anchors (clamped outside), so a 34.5-footer gets a value between the 30 ft and 40 ft anchors rather than jumping a size class. When a boat's length is unknown, the ~40 ft reference applies and the line says so at low confidence.

Labor and region

Labor-heavy jobs (rigging, bottom work, engine) scale by a coarse country-level factor for where the work will be done - by default the boat's location, overridable per deal - from ~0.8 in low-cost regions to ~1.2 in the US and northern Europe. Each row shows its rough labor share; parts-dominated items (sails, life raft, EPIRB) don't scale. This is deliberately coarse: it localizes a planning band, it does not price a yard.

The reference table

System~30 ft~40 ft~47.5 ftIntervalLabor shareConfidence / notes
Standing rigging (re-rig)
local quote advised
$3,000–$6,000$6,000–$10,000$10,000–$18,000~12 yr45%medium confidence - Wire + swage/mechanical terminals, mast in; add 30–50% for rod or mast-out yards.
Running rigging
local quote advised
$1,700–$2,500$2,500–$4,500$4,000–$7,000~6 yr30%medium confidence
Sails$3,000–$5,500$5,000–$9,000$8,000–$15,000~10 yr10%medium confidence - Band prices a working wardrobe (main + genoa), cruising dacron, loft-made; laminates cost more. When individual sails are known, each line carries its rough share of the band.
Bottom antifoul
local quote advised
$800–$1,800$1,500–$3,000$2,500–$4,500~2 yr60%medium confidence - Haul, prep, two coats ablative; excludes barrier work.
Barrier coat + paint
local quote advised
$3,000–$6,000$5,000–$10,000$8,000–$15,000~12 yr70%medium confidence
Life raft$1,700–$3,700$1,700–$3,700$2,500–$4,000~3 yr0%medium confidence - Purchase; a recert cycle runs $300–800.
Ground tackle$850–$2,000$1,500–$3,100$2,400–$5,000–0%medium confidence
EPIRB$680–$1,100$680–$1,100$680–$1,100–0%medium confidence
Dinghy + outboard$3,000–$7,000$4,000–$8,000$4,000–$9,000–0%medium confidence
Engine - repower
local quote advised
$15,000–$25,000$18,000–$30,000$20,000–$35,000–40%medium confidence - New auxiliary diesel, mounts, alignment; saildrive higher.
Engine - rebuild
local quote advised
$8,000–$12,000$10,000–$14,000$12,000–$18,000–60%medium confidence
Engine - major service
local quote advised
$1,500–$3,000$2,000–$4,000$3,000–$5,000–70%medium confidence

References behind each band

The kind label is the point: a published price is a list price you can check, a reported owner cost is what someone actually paid, a modelled estimate is our compilation. Where a reference has a public page we link it; where it is a compiled internal record we say so rather than link to something generic. Geography tells you whether the figures were observed where your boat will be worked on.

Standing rigging (re-rig)
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: re-rig, wire + swage/mechanical terminals, mast in
  • published priceTrade price lists, compiled · checked 2025-11 · US rigger, sailmaker and chandlery price lists · scope: 1x19 wire, terminals and rigger labor per stay
  • reported owner costOwner-reported refit costs, compiled · checked 2025-11 · US and EU owner-reported refit costs · scope: full re-rig invoices, 30–48 ft
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.
Running rigging
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: halyards, sheets, reefing lines - full set
  • published priceTrade price lists, compiled · checked 2025-11 · US rigger, sailmaker and chandlery price lists · scope: line per metre + splicing
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.
Sails
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: working wardrobe: main + genoa, cruising dacron
  • published priceTrade price lists, compiled · checked 2025-11 · US rigger, sailmaker and chandlery price lists · scope: loft list prices, dacron main and genoa by size
How the band is built: Parts-dominated: the band spans entry-level to mid-range brands at list price, no regional scaling. Interpolated by LOA where size matters.
Bottom antifoul
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: haul, prep, two coats ablative
  • reported owner costOwner-reported refit costs, compiled · checked 2025-11 · US and EU owner-reported refit costs · scope: yard antifoul invoices incl. haul
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.
Barrier coat + paint
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: strip, barrier coat, repaint
  • reported owner costOwner-reported refit costs, compiled · checked 2025-11 · US and EU owner-reported refit costs · scope: barrier-coat job invoices
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.
Life raft
  • published priceTrade price lists, compiled · checked 2025-11 · US and EU chandlery list prices · scope: 4–6 person coastal/offshore raft, purchase
How the band is built: Parts-dominated: the band spans entry-level to mid-range brands at list price, no regional scaling. Interpolated by LOA where size matters.
Ground tackle
  • published priceTrade price lists, compiled · checked 2025-11 · US and EU chandlery list prices · scope: anchor + chain + rode sized to LOA
How the band is built: Parts-dominated: the band spans entry-level to mid-range brands at list price, no regional scaling. Interpolated by LOA where size matters.
EPIRB
  • published priceTrade price lists, compiled · checked 2025-11 · US and EU chandlery list prices · scope: 406 MHz EPIRB, purchase
How the band is built: Parts-dominated: the band spans entry-level to mid-range brands at list price, no regional scaling. Interpolated by LOA where size matters.
Dinghy + outboard
  • published priceTrade price lists, compiled · checked 2025-11 · US and EU chandlery list prices · scope: inflatable tender + small outboard
How the band is built: Parts-dominated: the band spans entry-level to mid-range brands at list price, no regional scaling. Interpolated by LOA where size matters.
Engine - repower
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: new auxiliary diesel installed, shaft drive
  • published priceTrade price lists, compiled · checked 2025-11 · US and EU dealer list prices · scope: engine list prices by HP
  • reported owner costOwner-reported refit costs, compiled · checked 2025-11 · US and EU owner-reported refit costs · scope: repower invoices incl. mounts and alignment
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.
Engine - rebuild
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: in-frame rebuild, marine diesel 20–60 HP
  • reported owner costOwner-reported refit costs, compiled · checked 2025-11 · US and EU owner-reported refit costs · scope: rebuild invoices
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.
Engine - major service
  • modelled estimateKnotworth cost reference (PRD §10.1) · checked 2025-11 · US baseline; EU/UK via the regional labor factor · scope: major service: injectors, heat exchanger, mounts, fluids
  • reported owner costOwner-reported refit costs, compiled · checked 2025-11 · US and EU owner-reported refit costs · scope: major service invoices
How the band is built: Low = typical quote for a straightforward job on a production cruiser in the size class; high = the same job at a full-service yard with the usual extras. Interpolated by LOA between the three size anchors; labor-heavy bands scale by the regional labor factor of where the work is done.

Replacement intervals are risk windows, not cliffs

An interval is a typical service window, not an expiry date. A component at or past its window creates a reserve or a verification question - never a "confirmed defect". Documentation, inspection or a survey can move any line in either direction, and age-based items are always labeled AGE-BASED in the negotiation evidence, separate from confirmed problems.

Confidence, contingency and taxes

Every line carries a confidence level: high for deterministic transaction math, medium for banded work with known age, low for unknowns and unverified claims. Contingency runs 10–25% by boat age and how much of the big-ticket picture is verified. Tax lines (EU VAT by country, EU/US import duty, US state boat taxes with their caps) are estimates with the applicable rule named in the assumption - they are never certain without the paperwork, cross-border cases deserve a customs broker, and nothing here is tax or legal advice.

Your figures beat ours

Any line can be overridden with a real quote, and the override propagates to the total, the ceiling comparison and the verdict. A professional survey supersedes the whole Stage-1 estimate - Knotworth is a research aid for deciding whether a boat is worth the survey, as described here, not a replacement for one.

Methodology questions

Why do my yard's quotes differ from your ranges?+

They should - a range is a planning band, not a quote. Labor rates, yard access, and what the work uncovers all move the number. That's exactly why every line in a report can be replaced with your real quote, which then beats our estimate everywhere, including in the verdict.

When does a professional figure supersede Knotworth?+

Always. A surveyor's finding, a rigger's invoice or a yard quote outranks every model estimate. Enter it on the line and the report recomputes around it; after purchase, the survey supersedes the whole Stage-1 estimate.

How accurate is the AI condition read?+

The extraction is designed so the model can only quote, never invent: every 'work done' claim must cite a verbatim phrase from the listing or seller reply, with deterministic validation behind it. We score it continuously against a labeled test set covering hedges, partial work, contradictions and absences - and we treat that as an ongoing measurement, not a one-time proof.

Cost Methodology: How Knotworth Builds Its Ranges · Knotworth